This is a 4-story, 362 car integrated parking garage that is built with both precast concrete double tees and a cast-in-place, post-tensioned concrete beam-slab system. It is part of the 801 North Orange project that is located in the rapidly developing Uptown
District of Downtown Orlando, Florida.